<cite id="3gck0"></cite>
    1. <tt id="3gck0"></tt>
      
      
          <rt id="3gck0"><optgroup id="3gck0"></optgroup></rt>

          <rp id="3gck0"></rp>
        1. <strong id="3gck0"></strong>
        2. 咨詢服務 培訓服務
            肯達信服務熱線 CTS 統一客服電話
          400-690-0031
           
           
          首頁>咨詢服務>TCHIBO(TCM)驗廠咨詢
          Tchibo驗廠咨詢 --- (2014年最新標準)Tchibo 社會與環境監測方案(二)(英)

          The Tchibo Social and Environmental Monitoring Programme

          Supplier Manual for Non Food Business Partners 3.00e




          3. The Audit Process


          The implementation of the Tchibo SCoC is regularly reviewed in audits. An audit usually lasts

          a day and is conducted by up to 2 persons. Generally, these audits are announced with a

          two weeks timeframe. We reserve the right however to conduct unannounced audits at any

          time. There are two types of audits:


          ?  Factory Audits: Social and Environmental Aspects are an integral part of our Factory

          Audits. These are coordinated and conducted by employees working for Tchibo

          GmbH in Hamburg (mostly for factories in Africa, Europe and the Middle East) and

          Tchibo Merchandising Hong Kong (mostly for factories in Asia). In Factory Audits, the

          auditors primary check quality standards and the manufacturing capacity of the

          factory. Social and Environmental Aspects are also audited and separately graded

          with either “Suitable”, “Suitable with Follow-up necessary” or “Not suitable”.


          ?  External Risk and Compliance Audits: These audits focus on Social and

          Environmental Aspects. The Risk Audit covers the most important issues; the

          Compliance Audit is greater in scope and covers a wider range of compliance issues.

          Both audits are conducted by external, independent auditing firms such as UL

          Responsible Sourcing, a company accredited by the nongovernmental organization

          Social Accountability International (SAI). Social and Environmental Aspects will be

          graded separately with either “Suitable”, “Suitable with Follow-up necessary” or “Not

          suitable”.


          An audit consists of various components:

          -  Opening meet with the management

          -  An inspection of the production site

          -  A review of the documents

          -  Interviews with employees: Employee interviews are conducted separately and

             without presence of the management. The auditors will select the participants for

             these interviews.

          -  Final meeting in which the identified concerns are discussed, as well as the

          measures necessary for correcting them


          In preparation for the audit, all relevant documents should be made available, e.g. personnel

          files, payrolls and time records. A detailed list of all the important documents can be found in

          the appendix 7.2. Please find a self-assessment questionnaire in attachment 7.6 that will

          help you evaluate your potential compliance status in relation to the Tchibo Social and

          Environmental Code of Conduct and international labour standards.


          An order can only be placed at vendors/manufacturers with the audit result “Suitable” or

          “Suitable with Follow-up necessary”.; Zero Tolerance concerns, which lead to the overall

          result “Not suitable”, will need to be remediated before placing an order at the manufacturer.

          Business is discontinued with vendors/manufacturers that refuse an audit, repeatedly reach

          “Zero Tolerance” violations or do not cooperate sufficiently in the improvement process. The

          same applies for attempts at bribery or fraud. These acts are not tolerated by Tchibo and

          may lead to the termination of the business relationship.

          If the vendor/manufacturer refuses to permit the audit, he has to bear the costs for the

          rescheduled audit. Long-term refusal or delay of the process will lead to blacklisting for

          further Tchibo orders.


          SA8000

          SA8000. 社會責任管理體系認證咨詢項目
          點擊查看

          WAL-MART

          WAL-MART. 沃爾瑪客戶驗廠咨詢項目
          點擊查看

          ISO20000認證咨詢

          ISO20000. IT服務管理體系國際標準認證咨詢介紹
          點擊查看
          客服中心
          楊老師
          王老師
          徐老師
          郭小姐
          張小姐
          陳老師
          您好,我是肯達信管理顧問公司客服,歡迎咨詢!

          楊老師

          您好,我是肯達信管理顧問公司客服,歡迎咨詢!

          王老師

          您好,我是肯達信管理顧問公司客服,歡迎咨詢!

          徐老師

          您好,我是肯達信管理顧問公司客服,歡迎咨詢!

          郭小姐

          您好,我是肯達信管理顧問公司客服,歡迎咨詢!

          張小姐

          您好,我是肯達信管理顧問公司客服,歡迎咨詢!

          陳小姐


          客戶服務熱線

          400-690-0031

          24小時熱線

          18576401396


          展開客服
          午夜无码片在线观看影院中文